Saturday, 6 March 2010

Collected Body, Carpets, Seats ...

Fri 5th March 2010 - Work time = 0hrs ... Build Time To Date = 112hrs
Another "white van man" day ... collected all the remaining bits fom Westfield today.  Got off to an early start, leaving home at 4:15am and managed to get to Westfield at 8.  Spent some time with Mark to get some answers to my earlier questions:
1. No2 Injector needs to be swivelled around to clear the throttle linkage (may also need to remove some of the metal on the linkage) otherwise linkage is in the correct place.


2. The Coolant Temp sensor needs to be unclipped from the engine ... then it should be OK to reach the wire.
3. The oil pressure sensor needs to be swapped with a new one in the instrument pack

4.  Clutch cable can be in the top hole on the clutch arm with the grommet or lower hole without the gromemet.  Mark recommends the later.

Got back home and unloaded the van by about 1:30 ... most of the body panels had to be put loosely on the chassis ... the rest of the bits up in the attic.

It's starting to look a little like a car now ... oh and Sandra approves of the colour!
 

No comments:

Post a Comment