Sunday 25 October 2009

A quick turnover ... floor now fitted

Sunday 25th October - Work time = 3.5 hrs ... Build Time To Date = 18 hrs
As I mentioned yesterday I planned not to fit the off side exterior panel until after the pedals were fitted.  However I decided to drill the chassis in preparation as it would have been difficult to clamp it in place once the floor was fitted.
Then it was time to turn over the chassis to fit the floors.  Henry is climbing in France so had to enlist Amy  and Sandra to help with the lifting.  As it turns out Amy did most of the lifting at her and Sandra's end!
The floor panels were pretty straightforward so here is the completed underside.


Henry is back on Tuesday so I can turn it back over and start to fit some real stuff ... the pedals !